Concrete and Masonry Calculators
Bases, paths, footings and posts: work out the cubic metres of concrete a job takes and the bags or ready mix to order, with the working shown.
Calculators
Concrete base project
Block wall project
More calculators
Guides and charts
Which tool do I need?
- How much concrete does my job take, whatever its shape? Concrete Calculator
- How much concrete for a shed base or a path? Concrete Base Calculator
- How many cubic metres of ready mix do I order? Ready Mix Concrete Calculator
- How many bags of concrete mix for my pour? Concrete Bag Calculator
- How much gravel goes under a base? Gravel Calculator
Questions
What is the difference between bags and ready mix?
Bags are mixed by hand or in a mixer on site and counted by the bag. Ready mix arrives by lorry and is counted in cubic metres. The bag and ready mix calculators give the same job in both so the two can be compared.
Can I enter sizes in imperial?
Yes. Every size field accepts either system, and results follow the units switch on the calculator pages.
Where do the numbers come from?
Bag yields come from the maker's own figures, shown on each page with their source. How we calculate explains the rounding rule.