Enter the length, width and depth of the area to fill or dig and an allowance if you want one, and get the soil in cubic metres, with every step of the working shown.

Estimates for planning, not professional advice. Read the full notice.

Sizes

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 5 metres, 16 feet 4 and 7 eighths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 300 millimetres, 11 and 13 sixteenths inches

Example: a low spot

4.5 m³ (5.89 yd³) to order (4.5 m³ exact)

  • Volume in place, compacted 4.5 m³ (158.92 ft³)
  • The same volume in litres 4,500 L
  • Cubic metres at the supplier's minimum order 4.5 m³ (158.92 ft³)
  • Soil, 1 m³ (1.31 yd³) 4.5 m³ (5.89 yd³)

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How do I work out how much soil I need?

    Multiply the length and width in metres to get the area, then multiply by the depth in metres. A depth in millimetres is changed to metres first. The result is in cubic metres, and the calculator shows the same volume in litres.

    What does the allowance do?

    The allowance is a percentage added to the in-place volume to give the loose volume to bring in. It starts at nothing, and the figure is yours to enter.

    How much soil does a trench produce?

    Enter the trench's length, width and depth. The result is the volume dug out, in place, which is the volume to move or to refill; add an allowance if you want the loose volume.

    How many litres are in a cubic metre?

    The working above multiplies the cubic metres by the thousand litres in a cubic metre and shows the result as the litres line.

    Worked example: a low spot

    Show the working
    1. Area 5 m (16 ft 4 7/8 in) × 3 m (9 ft 10 1/8 in) = 15 m² (161.46 ft²)
    2. Volume in place, at the depth after compaction 15 m² (161.46 ft²) × 300 mm (11 13/16 in) (0.3 m) = 4.5 m³ (158.92 ft³)
    3. Loose volume: add the allowance 4.5 m³ (158.92 ft³) + 0% allowance = 4.5 m³ (158.92 ft³)
    4. Round up once, to the supplier's minimum order 4.5 m³ (158.92 ft³) = 4.5 m³ (158.92 ft³)

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Waste allowance 0%
    Default No allowance unless you enter one. Check your label or supplier.
    Allowance added to the in-place volume to give the loose volume 0%
    Default No allowance unless you enter one. Check your label or supplier.
    Supplier's minimum order, in cubic metres 0.25 m³ (8.83 ft³, converted)
    Default Suppliers sell loose material in set amounts. This amount is an example value: check your supplier.

    Loose volume at an allowance

    The example low spot at three allowances

    The example low spot at three allowances
    AllowanceIn placeLoose volumeLitres
    0% 4.5 m³ (158.92 ft³)4.5 m³ (158.92 ft³)4,500 L
    10% 4.5 m³ (158.92 ft³)4.95 m³ (174.81 ft³)4,950 L
    20% 4.5 m³ (158.92 ft³)5.4 m³ (190.7 ft³)5,400 L

    The calculator starts with no allowance. These three values only show how the input works: enter your own figure.

    Common jobs

    Soil in cubic metres and litres for common digging and filling jobs

    Soil in cubic metres and litres for common digging and filling jobs
    Job (size × depth)VolumeLitres
    Trench 12 m × 450 mm × 600 mm 3.24 m³ (114.42 ft³)3,240 L
    Levelling up 4 m × 3 m × 100 mm 1.2 m³ (42.38 ft³)1,200 L
    Pit 2 m × 2 m × 1 m 4 m³ (141.26 ft³)4,000 L

    Each row is worked out on its own, from the area and the depth, with no allowance. The sizes are examples to replace with your own.