Ready Mix Concrete Calculator

Enter the size of your pour and get the cubic metres of ready mix concrete to order, with a waste allowance and the working shown.

A ready-made setup of the Concrete Calculator.

Estimates for planning, not professional advice. Read the full notice.

Sizes

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 6 metres, 19 feet 8 and 1 quarter inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 150 millimetres, 5 and 7 eighths inches

Example: a drive

3 m³ (3.92 yd³) to order (2.97 m³ exact)

  • Concrete in the base 2.7 m³ (95.35 ft³)
  • The same job in bags 297 × 20 kg (44.1 lb) bags
  • Cubic metres at the supplier's minimum order 3 m³ (105.94 ft³)
  • Ready mix concrete, 1 m³ (1.31 yd³) 3 m³ (3.92 yd³)

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How much ready mix concrete do I need?

    Multiply the length, width and depth to get the volume, add a waste allowance, and read the total in cubic metres. The calculator shows the amount to order with every step.

    Why add a waste allowance?

    The volume worked out from your sizes is a starting figure. The allowance is added once, to the total, and you can change it to suit your job.

    Can I work out the same job in bags?

    Yes. The example on this page shows the same job in bags of mix, using the maker's own yield, with the count rounded up once.

    How much does a cubic metre of ready mix cost?

    Your supplier sets the price, and it changes with the mix, the delivery and any short-load charge, so this page does not give one. Ask for the price per cubic metre and multiply it by the amount to order.

    Worked example: a drive

    Show the working
    1. Base area 6 m (19 ft 8 1/4 in) × 3 m (9 ft 10 1/8 in) = 18 m² (193.75 ft²)
    2. Base volume 18 m² (193.75 ft²) × 150 mm (5 7/8 in) (0.15 m) = 2.7 m³ (95.35 ft³)
    3. Add the waste allowance 2.7 m³ (95.35 ft³) + 10% = 2.97 m³ (104.88 ft³)
    4. Round up once, to the supplier's minimum order 2.97 m³ (104.88 ft³) = 3 m³ (105.94 ft³)

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Waste allowance (your own figure) 10%
    Default Your own figure, not a sourced one. 10% is only the starting value; set the allowance you want.
    Yield of the 20 kg bag 0.01 m³ (0.35 ft³, converted)[1]
    One 20 kg bag of Blue Circle Multi-Purpose Concrete typically makes around 0.01 m³ of fresh concrete.
    Supplier's minimum order, in cubic metres 0.25 m³ (8.83 ft³, converted)
    Default Suppliers sell loose material in set amounts. This amount is an example value: check your supplier.

    Common jobs

    Ready mix concrete to order for common jobs

    Ready mix concrete to order for common jobs
    Job (length × width × depth)Concrete to order
    2.4 m × 1.8 m × 100 mm 0.48 m³ (16.78 ft³)
    6 m × 3 m × 150 mm 2.97 m³ (104.88 ft³)
    10 m × 500 mm × 300 mm 1.65 m³ (58.27 ft³)

    Each figure includes the waste allowance in the assumptions above, added once to the total.

    Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers. Figures come from each maker's published sheets and are shown for information only.

    Sources (1)

    1. Multi-Purpose Concrete Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023. Manufacturer data.
      “One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
      Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 1)

    These are summaries of what the sources say, not professional advice. Rules and product data change. Check with your local building control office and the product label about your own project.