Concrete Steps Calculator
HoneyDoMath.eu
Enter the riser height, tread depth and width of concrete steps, with a platform if there is one, and get the volume and the bags to buy, with each step's block worked out.
A ready-made setup of the Stair Calculator.
Estimates for planning, not professional advice. Read the full notice.
Example: three concrete steps
80 20 kg (44.1 lb) bags
- Concrete in the steps 0.72 m³ (25.5 ft³)
- To mix, with the allowance for waste 0.79 m³ (28.05 ft³)
Estimate for planning, from what you entered and the product data shown. Check product labels and your supplier before you buy.
Result
Enter a size to see your total.
Each product is rounded up once for the whole project, so the total can be less than the items bought alone added together. A line counted from a cut layout (sheets, boards or tiles laid out piece by piece) is counted for each item and added.
- Concrete mix, 20 kg (44.1 lb) bag 80
Questions
How much concrete for three steps?
The example above works out three steps with a platform, step by step. Enter your own riser, tread, width and platform for your own volume and bags.
How do I add a landing?
Add it as a second item on the shopping list: a landing is a flat box of concrete, so enter its length, width and thickness. The two items share one bag count.
Can it work out the number of steps from the total rise?
Yes. Fill in the total rise and the largest riser and the calculator divides the rise into whole risers, then uses each riser's equal height. It sets no riser or going limit.
Worked example: three concrete steps
Show the working
- Concrete in the first step 1.2 m (3 ft 11 1/4 in) × 170 mm (6 11/16 in) × 900 mm (2 ft 11 7/16 in) = 0.184 m³ (6.484 ft³)
- Concrete in the second step 1.2 m (3 ft 11 1/4 in) × 170 mm (6 11/16 in) × 1.18 m (3 ft 10 7/16 in) = 0.241 m³ (8.501 ft³)
- Concrete in the third step 1.2 m (3 ft 11 1/4 in) × 170 mm (6 11/16 in) × 1.46 m (4 ft 9 1/2 in) = 0.298 m³ (10.518 ft³)
- All the steps 0.184 m³ (6.484 ft³) + 0.241 m³ (8.501 ft³) + 0.298 m³ (10.518 ft³) = 0.722 m³ (25.503 ft³)
- Add the allowance for waste once 0.722 m³ (25.503 ft³) + 10% = 0.794 m³ (28.053 ft³)
- Divide by the volume of one bag 0.794 m³ (28.053 ft³) ÷ 0.01 m³ (0.35 ft³, converted)[1] = 79.44 bags
- Round up once, to whole bags 79.44 bags = 80 × 20 kg (44.1 lb) bags
Assumptions
The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.
| Assumption | Value | Details and changes |
|---|---|---|
| Concrete allowance for waste | 10% | |
| Default A typed allowance, not a source's figure: no hidden extra. Ten per cent is the starting example; ask your supplier. | ||
| Volume of one bag of Blue Circle High Strength Concrete (40N) 20 kg | 0.01 m³ (0.35 ft³, converted)[1] | |
| One 20 kg bag of Blue Circle High Strength Concrete (40N) typically makes around 0.01 m³ of fresh concrete. | ||
| Volume of one bag of Blue Circle Multi-Purpose Concrete 20 kg | 0.01 m³ (0.35 ft³, converted)[2] | |
| One 20 kg bag of Blue Circle Multi-Purpose Concrete typically makes around 0.01 m³ of fresh concrete. | ||
| Volume of one bag of Holcim High Performance Concrete 20 kg | approx. 0.01 m³ (0.35 ft³, converted)[3] | |
| One 20 kg bag of Holcim High Performance Concrete yields approximately 0.01 m³ of concrete. | ||
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Each step's block of concrete
The depth of each step's block and its concrete, for the example steps, counted from the top step
| Step | Depth of the block | Concrete |
|---|---|---|
| Step 1 | 900 mm (2 ft 11 7/16 in) | 0.18 m³ (6.48 ft³) |
| Step 2 | 1.18 m (3 ft 10 7/16 in) | 0.24 m³ (8.5 ft³) |
| Step 3 | 1.46 m (4 ft 9 1/2 in) | 0.3 m³ (10.52 ft³) |
A step's block runs from the front of its tread back to the wall or the platform, so lower steps hold more concrete. Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers.
Sources (3)
-
High Strength Concrete (40N) Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023.
Manufacturer data.
“One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 1) -
Multi-Purpose Concrete Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023.
Manufacturer data.
“One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 2) -
40N High Performance Concrete technical data sheet (opens in new tab), Holcim UK, April 2025.
Manufacturer data.
“One 20kg bag will yield approximately 0.01m3 of concrete, sufficient cover approximately 0.2m2 at 50mm depth.”
Per Holcim's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 3)
These are summaries of what the sources say, not professional advice. Rules and product data change. Check with your local building control office and the product label about your own project.
Sources
- [1] Blue Circle, High Strength Concrete (40N) Product Data Sheet. Checked 12 November 2026. https://uploadstarmaccom.blob.core.windows.net/bluecircle/sites/76/2024/03/BC_HighStrengthConcrete40N_TechINFO_SVD1223.pdf
- [2] Blue Circle, Multi-Purpose Concrete Product Data Sheet. Checked 12 November 2026. https://uploadstarmaccom.blob.core.windows.net/bluecircle/sites/76/2024/03/BC_MultiPurposeConcrete_TechINFO_SVD1223.pdf
- [3] Holcim, 40N High Performance Concrete technical data sheet. Checked 12 November 2026. https://www.holcim.co.uk/sites/uk/files/docs/hol8049_high-performance-concrete-tds-v2.pdf