Concrete Cost Calculator
HoneyDoMath.eu
Enter the size of a pour and get the bags and the cubic metres of ready mix for it. Your own prices go in the panel below: the page knows none and keeps none.
Estimates for planning, not professional advice. Read the full notice.
The drawing did not open. Length and width are still here.
Slab: shape and size
Skip the drawingDrag a round corner to move it. The small hollow diamond on a side is its curve handle: drag it across the side to curve the side (it is not a corner). To add a corner (a new point), tap the side itself, then choose Add a point here. Tapping a corner or a side opens its actions. Drag empty space to move the view; pinch, or Ctrl and the mouse wheel, to zoom. The keys are listed under Keys.
Keys
- Tab
- next corner; each says how far it is from corner 1
- Arrow keys on a corner
- move it one square; ten with Shift; 1 mm with Alt
- Delete or Backspace
- remove the corner; its two sides join in one straight side
- + on a corner
- add a corner halfway along the next side
- Arrow keys on the drawing
- move the view; further with Shift
- + and - on the drawing
- zoom in and out
- 0 on the drawing
- show the whole shape
- Ctrl+Z (Cmd+Z on a Mac)
- undo, except inside a typed field (it keeps its own)
- Ctrl+Shift+Z or Ctrl+Y
- redo
- Escape while dragging
- put it back where it was
- Enter on a corner or side
- go to its actions
- Escape in the actions
- close them and go back to the drawing
The drawing did not load. Check your connection and try again.
- Area
- 12 m² (129.17 ft²)
- Perimeter
- 14 m (45 ft 11 3/16 in)
- Cut-out edges
No area until the shape is fixed.
Estimate for planning, from what you entered and the product data shown. Check product labels and your supplier before you buy.
Shape: Rectangle Change
Sides
Corners
Cut-outs
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Example: a slab, bags and ready mix
132 20 kg (44.1 lb) bags
- Concrete in the slab 1.2 m³ (42.38 ft³)
- To mix, with the allowance for waste 1.32 m³ (46.62 ft³)
- Ready mix to order, with the allowance for waste 1.32 m³ (46.62 ft³)
Result
Enter a size to see your total.
Each product is rounded up once for the whole project, so the total can be less than the items bought alone added together. A line counted from a cut layout (sheets, boards or tiles laid out piece by piece) is counted for each item and added.
- Concrete mix, 20 kg (44.1 lb) bag 132
- Ready mix concrete, 1 m³ (1.31 yd³) 1.5 m³ (1.96 yd³)
Your prices
Type your own prices. They stay on this device: nothing is stored or sent, and this page has no price of its own to start from. A blank box is no price, not zero.
From your own receipt or shelf, for the bag chosen above.
Ask your supplier.
Ask your supplier. Blank means no minimum order.
Ask your supplier. Blank means none.
Ask your supplier.
Ask your supplier. Charged once when the order is under the minimum load.
Pump, fuel or anything else your supplier adds.
Ask your supplier. Blank counts one lorry.
Questions
Is it cheaper to mix bags or buy ready mix?
The panel shows both totals from the prices you type, and the difference between them, for the pour you entered. It holds no price of its own, so the answer is in your numbers.
What is a short-load fee?
A flat fee some suppliers add when an order is under their minimum load. It is an input in the panel; ask your supplier whether one applies.
How does the break-even work?
It finds the cubic metres at which the two totals are equal, from the prices and fees you typed, and says so when ready mix is higher or lower at every size.
Worked example: a slab, bags and ready mix
Show the working
- Slab volume 4 m (13 ft 1 1/2 in) × 3 m (9 ft 10 1/8 in) × 100 mm (3 15/16 in) = 1.2 m³ (42.38 ft³)
- Add the allowance for waste once 1.2 m³ (42.38 ft³) + 10% = 1.32 m³ (46.62 ft³)
- Divide by the volume of one bag 1.32 m³ (46.62 ft³) ÷ 0.01 m³ (0.35 ft³, converted)[1] = 132 bags
- Round up once, to whole bags 132 bags = 132 × 20 kg (44.1 lb) bags
Assumptions
The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.
| Assumption | Value | Details and changes |
|---|---|---|
| Concrete allowance for waste | 10% | |
| Default A typed allowance, not a source's figure: no hidden extra. Ten per cent is the starting example; ask your supplier. | ||
| Volume of one bag of Blue Circle High Strength Concrete (40N) 20 kg | 0.01 m³ (0.35 ft³, converted)[1] | |
| One 20 kg bag of Blue Circle High Strength Concrete (40N) typically makes around 0.01 m³ of fresh concrete. | ||
| Volume of one bag of Blue Circle Multi-Purpose Concrete 20 kg | 0.01 m³ (0.35 ft³, converted)[2] | |
| One 20 kg bag of Blue Circle Multi-Purpose Concrete typically makes around 0.01 m³ of fresh concrete. | ||
| Volume of one bag of Holcim High Performance Concrete 20 kg | approx. 0.01 m³ (0.35 ft³, converted)[3] | |
| One 20 kg bag of Holcim High Performance Concrete yields approximately 0.01 m³ of concrete. | ||
| Supplier's minimum order, in cubic metres | 0.5 m³ (17.66 ft³, converted) | |
| Default Suppliers set a minimum order for ready mix. This figure is an example value: ask your supplier. | ||
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Bags and cubic metres for common pours
Concrete with the allowance for waste and bags of the first mix in the list for common slabs, quantities only
| Pour (length × width × thickness) | Concrete with the allowance for waste | Bags |
|---|---|---|
| 2.4 m × 1.8 m × 10 cm | 0.48 m³ (16.78 ft³) | 48 × 20 kg (44.1 lb) bags |
| 5 m × 1 m × 7.5 cm | 0.41 m³ (14.57 ft³) | 42 × 20 kg (44.1 lb) bags |
| 4 m × 3 m × 10 cm | 1.32 m³ (46.62 ft³) | 132 × 20 kg (44.1 lb) bags |
| 6 m × 3 m × 15 cm | 2.97 m³ (104.88 ft³) | 297 × 20 kg (44.1 lb) bags |
Quantities only: the amounts of money come from you, in the panel above. Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers.
Sources (3)
-
High Strength Concrete (40N) Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023.
Manufacturer data.
“One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 1) -
Multi-Purpose Concrete Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023.
Manufacturer data.
“One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 2) -
40N High Performance Concrete technical data sheet (opens in new tab), Holcim UK, April 2025.
Manufacturer data.
“One 20kg bag will yield approximately 0.01m3 of concrete, sufficient cover approximately 0.2m2 at 50mm depth.”
Per Holcim's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 3)
These are summaries of what the sources say, not professional advice. Rules and product data change. Check with your local building control office and the product label about your own project.
Sources
- [1] Blue Circle, High Strength Concrete (40N) Product Data Sheet. Checked 12 November 2026. https://uploadstarmaccom.blob.core.windows.net/bluecircle/sites/76/2024/03/BC_HighStrengthConcrete40N_TechINFO_SVD1223.pdf
- [2] Blue Circle, Multi-Purpose Concrete Product Data Sheet. Checked 12 November 2026. https://uploadstarmaccom.blob.core.windows.net/bluecircle/sites/76/2024/03/BC_MultiPurposeConcrete_TechINFO_SVD1223.pdf
- [3] Holcim, 40N High Performance Concrete technical data sheet. Checked 12 November 2026. https://www.holcim.co.uk/sites/uk/files/docs/hol8049_high-performance-concrete-tds-v2.pdf