Enter the size of a pour and get the bags and the cubic metres of ready mix for it. Your own prices go in the panel below: the page knows none and keeps none.

Estimates for planning, not professional advice. Read the full notice.

Pour size

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 4 metres, 13 feet 1 and 1 half inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 100 millimetres, 3 and 15 sixteenths inches

Example: a slab, bags and ready mix

132 20 kg (44.1 lb) bags

  • Concrete in the slab 1.2 m³ (42.38 ft³)
  • To mix, with the allowance for waste 1.32 m³ (46.62 ft³)
  • Ready mix to order, with the allowance for waste 1.32 m³ (46.62 ft³)
  • Concrete mix, 20 kg (44.1 lb) bag 132
  • Ready mix concrete, 1 m³ (1.31 yd³) 1.5 m³ (1.96 yd³)

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Your prices

    Type your own prices. They stay on this device: nothing is stored or sent, and this page has no price of its own to start from. A blank box is no price, not zero.

    From your own receipt or shelf, for the bag chosen above.

    Ask your supplier.

    Ask your supplier. Blank means no minimum order.

    Ask your supplier. Blank means none.

    Ask your supplier.

    Ask your supplier. Charged once when the order is under the minimum load.

    Pump, fuel or anything else your supplier adds.

    Ask your supplier. Blank counts one lorry.

    Questions

    Is it cheaper to mix bags or buy ready mix?

    The panel shows both totals from the prices you type, and the difference between them, for the pour you entered. It holds no price of its own, so the answer is in your numbers.

    What is a short-load fee?

    A flat fee some suppliers add when an order is under their minimum load. It is an input in the panel; ask your supplier whether one applies.

    How does the break-even work?

    It finds the cubic metres at which the two totals are equal, from the prices and fees you typed, and says so when ready mix is higher or lower at every size.

    Worked example: a slab, bags and ready mix

    Show the working
    1. Slab volume 4 m (13 ft 1 1/2 in) × 3 m (9 ft 10 1/8 in) × 100 mm (3 15/16 in) = 1.2 m³ (42.38 ft³)
    2. Add the allowance for waste once 1.2 m³ (42.38 ft³) + 10% = 1.32 m³ (46.62 ft³)
    3. Divide by the volume of one bag 1.32 m³ (46.62 ft³) ÷ 0.01 m³ (0.35 ft³, converted)[1] = 132 bags
    4. Round up once, to whole bags 132 bags = 132 × 20 kg (44.1 lb) bags

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Concrete allowance for waste 10%
    Default A typed allowance, not a source's figure: no hidden extra. Ten per cent is the starting example; ask your supplier.
    Volume of one bag of Blue Circle High Strength Concrete (40N) 20 kg 0.01 m³ (0.35 ft³, converted)[1]
    One 20 kg bag of Blue Circle High Strength Concrete (40N) typically makes around 0.01 m³ of fresh concrete.
    Volume of one bag of Blue Circle Multi-Purpose Concrete 20 kg 0.01 m³ (0.35 ft³, converted)[2]
    One 20 kg bag of Blue Circle Multi-Purpose Concrete typically makes around 0.01 m³ of fresh concrete.
    Volume of one bag of Holcim High Performance Concrete 20 kg approx. 0.01 m³ (0.35 ft³, converted)[3]
    One 20 kg bag of Holcim High Performance Concrete yields approximately 0.01 m³ of concrete.
    Supplier's minimum order, in cubic metres 0.5 m³ (17.66 ft³, converted)
    Default Suppliers set a minimum order for ready mix. This figure is an example value: ask your supplier.

    Bags and cubic metres for common pours

    Concrete with the allowance for waste and bags of the first mix in the list for common slabs, quantities only

    Concrete with the allowance for waste and bags of the first mix in the list for common slabs, quantities only
    Pour (length × width × thickness)Concrete with the allowance for wasteBags
    2.4 m × 1.8 m × 10 cm 0.48 m³ (16.78 ft³)48 × 20 kg (44.1 lb) bags
    5 m × 1 m × 7.5 cm 0.41 m³ (14.57 ft³)42 × 20 kg (44.1 lb) bags
    4 m × 3 m × 10 cm 1.32 m³ (46.62 ft³)132 × 20 kg (44.1 lb) bags
    6 m × 3 m × 15 cm 2.97 m³ (104.88 ft³)297 × 20 kg (44.1 lb) bags

    Quantities only: the amounts of money come from you, in the panel above. Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers.

    Sources (3)

    1. High Strength Concrete (40N) Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023. Manufacturer data.
      “One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
      Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 1)
    2. Multi-Purpose Concrete Product Data Sheet (opens in new tab), Tarmac Trading Limited (Blue Circle), December 2023. Manufacturer data.
      “One 20kg bag will typically produce around 0.01 m3 of fresh concrete (0.33m x 0.33m x 0.1m).”
      Per Blue Circle's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 2)
    3. 40N High Performance Concrete technical data sheet (opens in new tab), Holcim UK, April 2025. Manufacturer data.
      “One 20kg bag will yield approximately 0.01m3 of concrete, sufficient cover approximately 0.2m2 at 50mm depth.”
      Per Holcim's data sheet, checked 12 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 3)