Paving Calculator

Enter a paved patio's size and your paving slab or block size and joint, and get the slabs or blocks, with a border if you want one, rounded up once, with the working shown for an example patio. A patio that is not a rectangle can be drawn.

Estimates for planning, not professional advice. Read the full notice.

Patio and slab sizes

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 4 metres, 13 feet 1 and 1 half inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 600 millimetres, 1 foot 11 and 5 eighths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 300 millimetres, 11 and 13 sixteenths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

Example: a patio

70 paving slabs

  • Patio area 12 m² (129.17 ft²)
  • Slabs, exact 66.67 slabs
  • Paving slabs 70

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How many paving slabs or blocks do I need?

    Type the patio's size and the size of your slab or block, with a joint if you leave one. The calculator divides the area by one slab plus its joint and adds your waste allowance, rounded up once.

    How are border slabs counted?

    Choose the number of border rows and, if the border slab is a different size, type it. The band is the rows times the border slab's width on every side, and the field inside it is counted separately.

    Worked example: a patio

    Show the working
    1. Patio area: length times width 4 m (13 ft 1 1/2 in) × 3 m (9 ft 10 1/8 in) = 12 m² (129.17 ft²)
    2. Slabs: the area divided by one slab and its joint 12 m² (129.17 ft²) ÷ 0.18 m² (1.94 ft²) = 66.67 slabs
    3. Add the waste allowance and round up once 66.67 slabs × 1.05 = 70 paving slabs

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Waste allowance 5%
    Default Your own allowance. No source is cited for it here; ask your supplier.
    Slab or block length 600 mm (1 ft 11 5/8 in, converted)[1]
    Marshalls' data sheet gives its Standard Pimple paving 600 × 300 × 63 mm at 5.6 per m², in packs of 16 covering 2.9 m².
    Slab or block width 300 mm (11 13/16 in, converted)[1]
    Marshalls' data sheet gives its Standard Pimple paving 600 × 300 × 63 mm at 5.6 per m², in packs of 16 covering 2.9 m².

    Field and border slabs for the example patio

    The example patio with a border of smaller slabs: field slabs and border slabs to buy by the number of border rows

    The example patio with a border of smaller slabs: field slabs and border slabs to buy by the number of border rows
    Border rowsBorder band widthField slabsBorder slabs
    No border 0 mm (0 in)70 paving slabs0 paving slabs
    One row 150 mm (5 7/8 in)59 paving slabs47 paving slabs
    Two rows 300 mm (11 13/16 in)48 paving slabs90 paving slabs
    Three rows 450 mm (1 ft 5 11/16 in)38 paving slabs129 paving slabs

    A border of another slab size is its own line. The band is the rows times the border slab's width on every side, and the field is what is left inside it. The sizes are examples. Product names are trademarks of their owners. HoneyDoMath is not affiliated with, sponsored by or endorsed by these makers.

    Sources (1)

    1. Standard Pimple 600 x 300 x 63 datasheet (opens in new tab), Marshalls plc, Data sheet, no date printed. Manufacturer data.
      “Nominal Dimensions (mm) 600 x 300 x 63 ... 5.6 no per m2 ... Av. Pack Size m2 2.9 ... Units Per Pack 16”
      Per Marshalls' data sheet, checked 14 Nov 2026. Figures and regulations change; verify with the source. Back to where this is used (Source 1)

    These are summaries of what the sources say, not professional advice. Rules and product data change. Check with your local building control office and the product label about your own project.