Aggregate Calculator

Enter the length, width and depth and get the aggregate to order in cubic metres, rounded up once to the supplier's minimum order, with the working shown for an example. Tonnes and bags are there too, at an example weight and bag sizes you replace with your supplier's.

A ready-made setup of the Gravel Calculator.

Estimates for planning, not professional advice. Read the full notice.

Area size

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 4 metres, 13 feet 1 and 1 half inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Enter the depth in millimetres, or type a unit.

reads as 100 millimetres, 3 and 15 sixteenths inches

Example: an area of aggregate

1.25 m³ (1.63 yd³) to order (1.2 m³ exact)

  • Volume in the area 1.2 m³ (42.38 ft³)
  • Cubic metres to order 1.2 m³ (42.38 ft³)
  • Cubic metres at the supplier's minimum order 1.25 m³ (44.14 ft³)
  • Tonnes at the weight above 1.9 t
  • Tonnes at the supplier's minimum order 2 t
  • Aggregate by the cubic metre, 1 m³ (1.31 yd³) 1.25 m³ (1.63 yd³)

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How much aggregate do I need?

    Enter the length, width and depth. The calculator multiplies them for the volume, adds the waste allowance once and rounds up once, to the supplier's minimum order in cubic metres.

    How many tonnes is that?

    The calculator multiplies the volume by the weight in the assumptions. That weight is an example, not a figure from a source: replace it with the weight your supplier gives.

    Is anything added for waste?

    No hidden allowance: waste starts at nothing, it is a row you can change, and it is added once.

    Worked example: an area of aggregate

    Show the working
    1. Area 4 m (13 ft 1 1/2 in) × 3 m (9 ft 10 1/8 in) = 12 m² (129.17 ft²)
    2. Volume at the depth 12 m² (129.17 ft²) × 100 mm (3 15/16 in) (0.1 m) = 1.2 m³ (42.38 ft³)
    3. Add the waste allowance, once 1.2 m³ (42.38 ft³) + 0 per cent waste = 1.2 m³ (42.38 ft³)
    4. Round up once, to the supplier's minimum order 1.2 m³ (42.38 ft³) = 1.25 m³ (44.14 ft³)
    5. Tonnes: multiply by the weight of a cubic metre 1.2 m³ (42.38 ft³) × 1,600 kg/m³ (1.6 t/m³) = 1.9 t
    6. Round up once, to the supplier's minimum tonnage 1.9 t = 2 t

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Weight of aggregate, example 1,600 kg/m³ (1.6 t/m³, as published)
    Default An example to replace, not a figure from a source. Ask your supplier for the weight per cubic metre.
    Waste allowance 0%
    Default No hidden allowance. Check your label or supplier.
    Supplier's minimum order in cubic metres 0.25 m³ (8.83 ft³, converted)
    Default Suppliers set a minimum order for loose material. This figure is an example to replace. Ask your supplier.
    Supplier's minimum order in tonnes 0.5 t
    Default Suppliers set a minimum order by weight. This figure is an example to replace. Ask your supplier.

    Aggregate by depth

    Cubic metres of aggregate for the area of the example at four depths, with no waste allowance

    Cubic metres of aggregate for the area of the example at four depths, with no waste allowance
    DepthCubic metresCubic metres at the supplier's minimum order
    20 mm (13/16 in) 0.24 m³ (8.48 ft³)0.25 m³ (8.83 ft³)
    50 mm (1 15/16 in) 0.6 m³ (21.19 ft³)0.75 m³ (26.49 ft³)
    100 mm (3 15/16 in) 1.2 m³ (42.38 ft³)1.25 m³ (44.14 ft³)
    150 mm (5 7/8 in) 1.8 m³ (63.57 ft³)2 m³ (70.63 ft³)

    Each depth is worked out on its own, with the minimum order in the assumptions.