Gravel Driveway Calculator

Enter the length and width of the drive and the depth of each layer and get the sub-base and the surface gravel as two separate orders in tonnes, each with its bulking allowance and rounded up on its own.

A ready-made setup of the Gravel Calculator.

Estimates for planning, not professional advice. Read the full notice.

Drive size

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 10 metres, 32 feet 9 and 11 sixteenths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 3 metres, 9 feet 10 and 1 eighth inches

Enter the depth in millimetres, or type a unit.

reads as 100 millimetres, 3 and 15 sixteenths inches

Enter the depth in millimetres, or type a unit.

reads as 50 millimetres, 1 and 15 sixteenths inches

The deepest layer spread loose before compacting. The starting value is an example to replace.

reads as 150 millimetres, 5 and 7 eighths inches

Example: a gravel drive

5 t to order (4.8 t exact)

  • Sub-base: loose volume, with its allowance 3 m³ (105.94 ft³)
  • Sub-base, tonnes at the supplier's minimum order 5 t
  • Surface gravel: loose volume, with its allowance 1.5 m³ (52.97 ft³)
  • Surface gravel, tonnes at the supplier's minimum order 2.5 t
  • Sub-base: layers at the deepest loose layer 1 layer
  • Sub-base by the tonne, 1 t 5 t
  • Surface gravel by the tonne, 1 t 2.5 t

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    Why does the calculator work in two layers?

    A gravel drive is built as a sub-base and a surface layer. Each has its own depth, weight and bulking allowance and is bought as its own product, so each is rounded up once and never mixed into the other.

    What is a layer of loose material?

    It is one layer of loose material spread before it is compacted. The calculator counts the layers each course of material needs at the deepest loose layer you set; the starting value is an example.

    Where do the weights and bulking allowances come from?

    They are examples to replace with your supplier's figures. No weight or bulking allowance is taken from a source, and the allowance starts at nothing.

    Worked example: a gravel drive

    Show the working
    1. Sub-base: volume in place 30 m² (322.92 ft²) × 100 mm (3 15/16 in) (0.1 m) = 3 m³ (105.94 ft³)
    2. Sub-base: loose volume, with its allowance 3 m³ (105.94 ft³) + 0 per cent allowance = 3 m³ (105.94 ft³)
    3. Sub-base: tonnes at the weight 3 m³ (105.94 ft³) × 1,600 kg/m³ (1.6 t/m³) = 4.8 t
    4. Sub-base: round up once, to the minimum tonnage 4.8 t = 5 t
    5. Surface gravel: volume in place 30 m² (322.92 ft²) × 50 mm (1 15/16 in) (0.05 m) = 1.5 m³ (52.97 ft³)
    6. Surface gravel: loose volume, with its allowance 1.5 m³ (52.97 ft³) + 0 per cent allowance = 1.5 m³ (52.97 ft³)
    7. Surface gravel: tonnes at the weight 1.5 m³ (52.97 ft³) × 1,600 kg/m³ (1.6 t/m³) = 2.4 t
    8. Surface gravel: round up once, to the minimum tonnage 2.4 t = 2.5 t

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Weight of the sub-base, example 1,600 kg/m³ (1.6 t/m³, as published)
    Default An example to replace, not a figure from a source. Ask your supplier.
    Weight of the surface gravel, example 1,600 kg/m³ (1.6 t/m³, as published)
    Default An example to replace, not a figure from a source. Ask your supplier.
    Waste allowance 0%
    Default No hidden allowance. Check your label or supplier.
    Sub-base bulking allowance, example 0%
    Default The share added to the compacted depth to get the loose amount. It starts at nothing: enter your supplier's figure.
    Surface bulking allowance, example 0%
    Default The share added to the compacted depth to get the loose amount. It starts at nothing: enter your supplier's figure.
    Supplier's minimum order in tonnes 0.5 t
    Default Suppliers set a minimum order by weight. This figure is an example to replace. Ask your supplier.

    Sub-base and surface tonnes by drive size

    Tonnes of sub-base and surface gravel for five drive sizes at the starting depths, at the supplier's minimum tonnage

    Tonnes of sub-base and surface gravel for five drive sizes at the starting depths, at the supplier's minimum tonnage
    Drive areaSub-base, tonnesSurface, tonnes
    12.5 m² (134.55 ft²) 2 t1 t
    30 m² (322.92 ft²) 5 t2.5 t
    35 m² (376.74 ft²) 6 t3 t
    60 m² (645.83 ft²) 10 t5 t
    100 m² (1,076.39 ft²) 16 t8 t

    Each row is worked out on its own, each layer with its bulking allowance and rounded up separately. The depths are the starting fields, not a rule for any drive.