Self-Binding Gravel Calculator
HoneyDoMath.eu
Enter the length, width and compacted depth and get the loose self-binding gravel to order in cubic metres, with the compaction allowance added and shown. Tonnes need the weight your supplier gives.
A ready-made setup of the Gravel Calculator.
Estimates for planning, not professional advice. Read the full notice.
The drawing did not open. Length and width are still here.
Path: shape and size
Skip the drawingDrag a round corner to move it. The small hollow diamond on a side is its curve handle: drag it across the side to curve the side (it is not a corner). To add a corner (a new point), tap the side itself, then choose Add a point here. Tapping a corner or a side opens its actions. Drag empty space to move the view; pinch, or Ctrl and the mouse wheel, to zoom. The keys are listed under Keys.
Keys
- Tab
- next corner; each says how far it is from corner 1
- Arrow keys on a corner
- move it one square; ten with Shift; 1 mm with Alt
- Delete or Backspace
- remove the corner; its two sides join in one straight side
- + on a corner
- add a corner halfway along the next side
- Arrow keys on the drawing
- move the view; further with Shift
- + and - on the drawing
- zoom in and out
- 0 on the drawing
- show the whole shape
- Ctrl+Z (Cmd+Z on a Mac)
- undo, except inside a typed field (it keeps its own)
- Ctrl+Shift+Z or Ctrl+Y
- redo
- Escape while dragging
- put it back where it was
- Enter on a corner or side
- go to its actions
- Escape in the actions
- close them and go back to the drawing
The drawing did not load. Check your connection and try again.
- Area
- 20 m² (215.28 ft²)
- Perimeter
- 24 m (78 ft 8 7/8 in)
- Cut-out edges
No area until the shape is fixed.
Estimate for planning, from what you entered and the product data shown. Check product labels and your supplier before you buy.
Shape: Rectangle Change
Sides
Corners
Cut-outs
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Example: a self-binding gravel path
1 m³ (1.31 yd³) to order (1 m³ exact)
- Volume in place 1 m³ (35.31 ft³)
- Cubic metres to order 1 m³ (35.31 ft³)
- Cubic metres at the supplier's minimum order 1 m³ (35.31 ft³)
Result
Enter a size to see your total.
Each product is rounded up once for the whole project, so the total can be less than the items bought alone added together. A line counted from a cut layout (sheets, boards or tiles laid out piece by piece) is counted for each item and added.
- Self-binding gravel by the cubic metre, 1 m³ (1.31 yd³) 1 m³ (1.31 yd³)
Questions
How much self-binding gravel do I need?
Enter the length, width and depth. The calculator multiplies them for the volume, adds the waste allowance once and rounds up once, to the supplier's minimum order in cubic metres.
Why is the loose amount larger than the path volume?
Material arrives loose and settles when it is compacted, so the order is the compacted volume plus an allowance. The allowance starts at nothing and is yours to set.
Is anything added for waste?
No hidden allowance: waste starts at nothing, it is a row you can change, and it is added once.
Worked example: a self-binding gravel path
Show the working
- Area 10 m (32 ft 9 11/16 in) × 2 m (6 ft 6 3/4 in) = 20 m² (215.28 ft²)
- Volume at the depth 20 m² (215.28 ft²) × 50 mm (1 15/16 in) (0.05 m) = 1 m³ (35.31 ft³)
- Add the compaction allowance to get loose material 1 m³ (35.31 ft³) + 0 per cent allowance = 1 m³ (35.31 ft³)
- Add the waste allowance, once 1 m³ (35.31 ft³) + 0 per cent waste = 1 m³ (35.31 ft³)
- Round up once, to the supplier's minimum order 1 m³ (35.31 ft³) = 1 m³ (35.31 ft³)
Assumptions
The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.
| Assumption | Value | Details and changes |
|---|---|---|
| Waste allowance | 0% | |
| Default No hidden allowance. Check your label or supplier. | ||
| Compaction allowance | 0% | |
| Default The share of the depth that settles when compacted. It starts at nothing: enter the figure your supplier gives. | ||
| Supplier's minimum order in cubic metres | 0.25 m³ (8.83 ft³, converted) | |
| Default Suppliers set a minimum order for loose material. This figure is an example to replace. Ask your supplier. | ||
| Supplier's minimum order in tonnes | 0.5 t | |
| Default Suppliers set a minimum order by weight. This figure is an example to replace. Ask your supplier. | ||
Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm
Self-binding gravel by depth
Cubic metres of self-binding gravel for the area of the example at four depths, with no waste allowance
| Depth | Cubic metres | Cubic metres at the supplier's minimum order |
|---|---|---|
| 20 mm (13/16 in) | 0.4 m³ (14.13 ft³) | 0.5 m³ (17.66 ft³) |
| 50 mm (1 15/16 in) | 1 m³ (35.31 ft³) | 1 m³ (35.31 ft³) |
| 100 mm (3 15/16 in) | 2 m³ (70.63 ft³) | 2 m³ (70.63 ft³) |
| 150 mm (5 7/8 in) | 3 m³ (105.94 ft³) | 3 m³ (105.94 ft³) |
Each depth is worked out on its own, with the minimum order in the assumptions.