Self-Binding Gravel Calculator

Enter the length, width and compacted depth and get the loose self-binding gravel to order in cubic metres, with the compaction allowance added and shown. Tonnes need the weight your supplier gives.

A ready-made setup of the Gravel Calculator.

Estimates for planning, not professional advice. Read the full notice.

Path size

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 10 metres, 32 feet 9 and 11 sixteenths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 2 metres, 6 feet 6 and 3 quarters inches

Enter the depth in millimetres, or type a unit.

reads as 50 millimetres, 1 and 15 sixteenths inches

Ask your supplier for the weight per cubic metre. Check your label or supplier.

Example: a self-binding gravel path

1 m³ (1.31 yd³) to order (1 m³ exact)

  • Volume in place 1 m³ (35.31 ft³)
  • Cubic metres to order 1 m³ (35.31 ft³)
  • Cubic metres at the supplier's minimum order 1 m³ (35.31 ft³)
  • Self-binding gravel by the cubic metre, 1 m³ (1.31 yd³) 1 m³ (1.31 yd³)

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How much self-binding gravel do I need?

    Enter the length, width and depth. The calculator multiplies them for the volume, adds the waste allowance once and rounds up once, to the supplier's minimum order in cubic metres.

    Why is the loose amount larger than the path volume?

    Material arrives loose and settles when it is compacted, so the order is the compacted volume plus an allowance. The allowance starts at nothing and is yours to set.

    Is anything added for waste?

    No hidden allowance: waste starts at nothing, it is a row you can change, and it is added once.

    Worked example: a self-binding gravel path

    Show the working
    1. Area 10 m (32 ft 9 11/16 in) × 2 m (6 ft 6 3/4 in) = 20 m² (215.28 ft²)
    2. Volume at the depth 20 m² (215.28 ft²) × 50 mm (1 15/16 in) (0.05 m) = 1 m³ (35.31 ft³)
    3. Add the compaction allowance to get loose material 1 m³ (35.31 ft³) + 0 per cent allowance = 1 m³ (35.31 ft³)
    4. Add the waste allowance, once 1 m³ (35.31 ft³) + 0 per cent waste = 1 m³ (35.31 ft³)
    5. Round up once, to the supplier's minimum order 1 m³ (35.31 ft³) = 1 m³ (35.31 ft³)

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Waste allowance 0%
    Default No hidden allowance. Check your label or supplier.
    Compaction allowance 0%
    Default The share of the depth that settles when compacted. It starts at nothing: enter the figure your supplier gives.
    Supplier's minimum order in cubic metres 0.25 m³ (8.83 ft³, converted)
    Default Suppliers set a minimum order for loose material. This figure is an example to replace. Ask your supplier.
    Supplier's minimum order in tonnes 0.5 t
    Default Suppliers set a minimum order by weight. This figure is an example to replace. Ask your supplier.

    Self-binding gravel by depth

    Cubic metres of self-binding gravel for the area of the example at four depths, with no waste allowance

    Cubic metres of self-binding gravel for the area of the example at four depths, with no waste allowance
    DepthCubic metresCubic metres at the supplier's minimum order
    20 mm (13/16 in) 0.4 m³ (14.13 ft³)0.5 m³ (17.66 ft³)
    50 mm (1 15/16 in) 1 m³ (35.31 ft³)1 m³ (35.31 ft³)
    100 mm (3 15/16 in) 2 m³ (70.63 ft³)2 m³ (70.63 ft³)
    150 mm (5 7/8 in) 3 m³ (105.94 ft³)3 m³ (105.94 ft³)

    Each depth is worked out on its own, with the minimum order in the assumptions.