Compost Calculator

Enter the length, width and depth and get the compost to order in cubic metres, rounded up once to the supplier's minimum order, with the working shown for an example. Tonnes and bags are there too, at an example weight and bag sizes you replace with your supplier's.

A ready-made setup of the Raised Bed Soil Calculator.

Estimates for planning, not professional advice. Read the full notice.

Bed or lawn size

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 10 metres, 32 feet 9 and 11 sixteenths inches

Metres, centimetres or millimetres, like 3.8 m, 10 cm or 250 mm

reads as 5 metres, 16 feet 4 and 7 eighths inches

Enter the depth in millimetres, or type a unit.

reads as 20 millimetres, 13 sixteenths of an inch

Example: a flower bed

1 m³ (1.31 yd³) to order (1 m³ exact)

  • Volume in the area 1 m³ (35.31 ft³)
  • Cubic metres to order 1 m³ (35.31 ft³)
  • Cubic metres at the supplier's minimum order 1 m³ (35.31 ft³)
  • Tonnes at the weight above 0.5 t
  • Tonnes at the supplier's minimum order 0.5 t
  • Compost by the cubic metre, 1 m³ (1.31 yd³) 1 m³ (1.31 yd³)

Share this project

This link carries:

    The project is inside the link, after the # sign. Browsers do not send that part to the site.

    Questions

    How much compost do I need?

    Enter the length, width and depth. The calculator multiplies them for the volume, adds the waste allowance once and rounds up once, to the supplier's minimum order in cubic metres.

    How many tonnes is that?

    The calculator multiplies the volume by the weight in the assumptions. That weight is an example, not a figure from a source: replace it with the weight your supplier gives.

    Is anything added for waste?

    No hidden allowance: waste starts at nothing, it is a row you can change, and it is added once.

    Worked example: a flower bed

    Show the working
    1. Area 10 m (32 ft 9 11/16 in) × 5 m (16 ft 4 7/8 in) = 50 m² (538.2 ft²)
    2. Volume at the depth 50 m² (538.2 ft²) × 20 mm (13/16 in) (0.02 m) = 1 m³ (35.31 ft³)
    3. Add the waste allowance, once 1 m³ (35.31 ft³) + 0 per cent waste = 1 m³ (35.31 ft³)
    4. Round up once, to the supplier's minimum order 1 m³ (35.31 ft³) = 1 m³ (35.31 ft³)
    5. Tonnes: multiply by the weight of a cubic metre 1 m³ (35.31 ft³) × 500 kg/m³ (0.5 t/m³) = 0.5 t
    6. Round up once, to the supplier's minimum tonnage 0.5 t = 0.5 t
    7. Bags: divide by the bag size, round up once 1 m³ (35.31 ft³) ÷ 40 L = 25 × 40 L (1.41 ft³) bags

    Assumptions

    The figures behind the example. Sourced figures link to their source below; a default is a starting value to check against your label or supplier.

    AssumptionValueDetails and changes
    Weight of compost, example 500 kg/m³ (0.5 t/m³, as published)
    Default An example to replace, not a figure from a source. Ask your supplier for the weight per cubic metre.
    Waste allowance 0%
    Default No hidden allowance. Check your label or supplier.
    Supplier's minimum order in cubic metres 0.25 m³ (8.83 ft³, converted)
    Default Suppliers set a minimum order for loose material. This figure is an example to replace. Ask your supplier.
    Supplier's minimum order in tonnes 0.5 t
    Default Suppliers set a minimum order by weight. This figure is an example to replace. Ask your supplier.
    Bag size in litres 40 L
    Default The bag size is printed on the label. The sizes shown are examples, not figures from a source. Check your label.

    Compost by depth

    Cubic metres of compost for the area of the example at four depths, with no waste allowance

    Cubic metres of compost for the area of the example at four depths, with no waste allowance
    DepthCubic metresCubic metres at the supplier's minimum orderBags of the size above
    20 mm (13/16 in) 1 m³ (35.31 ft³)1 m³ (35.31 ft³)25 bags
    50 mm (1 15/16 in) 2.5 m³ (88.29 ft³)2.5 m³ (88.29 ft³)63 bags
    100 mm (3 15/16 in) 5 m³ (176.57 ft³)5 m³ (176.57 ft³)125 bags
    150 mm (5 7/8 in) 7.5 m³ (264.86 ft³)7.5 m³ (264.86 ft³)188 bags

    Each depth is worked out on its own, with the minimum order in the assumptions.